5 metrics to boost team productivity

5 metrics to boost team productivity

Andreina Garcia Zapata, Agile Coach

Andreina Garcia Zapata

Agile Coach

November 6, 2025

The Scaled Agile Framework (SAFe) emphasizes the importance of measurement to gain visibility into performance, identify areas for continuous improvement, and foster transparency at all levels of the organization. At the team level, SAFe proposes a set of key metrics that provide valuable information about the Scrum team's capacity, quality, efficiency, and health.

collaboration.webp

Below, each of the mentioned metrics is developed in detail:

1. Team velocity:

  • Definition: Team velocity is the measure of the amount of work a Scrum team can complete within an iteration or sprint. Traditionally, it is expressed in story points, although a count of work items (like user stories or small features) can also be used if the team does not use point estimation.

  • Purpose and Value:

    • Predicting Future Work: A team's historical velocity becomes a fundamental tool for planning future iterations. By knowing their average capacity, the team can more realistically commit to the amount of work they can deliver in the next sprint. This helps prevent overload and set more accurate expectations with the Product Owner and other stakeholders.

    • Continuous Improvement: Tracking velocity over time allows the team to identify trends. A steady increase in velocity may indicate an improvement in efficiency, collaboration, or the removal of impediments. Conversely, a decrease may signal underlying problems that need to be investigated and addressed (e.g., accumulated technical debt, frequent interruptions, lack of clarity in requirements).

    • Release Planning: At a higher level, the aggregated velocity of several teams within an Agile Release Train (ART) can be used for planning Program Increments (PIs), helping to estimate the amount of value the ART can deliver over a more extended period.

    • Transparency: Velocity provides a tangible and understandable metric for stakeholders, offering a view of the pace at which the team is delivering value.

  • Important Considerations:

    • Consistency in Estimation: For velocity to be a meaningful metric, it is crucial for the team to maintain reasonable consistency in their approach to estimating story points. Drastic changes in the way of estimating can distort the velocity trend.

    • Not an Individual Productivity Metric: Velocity is a team metric, not a measure of the individual performance of its members. Using it to compare "productivity" between individuals is a mistake and can lead to demotivation and dysfunctional behaviors.

    • Context is Key: The velocity of different teams should not be directly compared, as each team operates in a unique context, with different levels of work complexity, experience, and tools.

2. Throughput:

  • Definition: Throughput measures the number of work items (user stories, features, etc.) that a team completes and delivers to production (or the next relevant step in the value stream) within a specific time period (e.g., per iteration, per month, per PI).

sincerely-media-6_HadzC9SAU-unsplash-copia.webp

  • Purpose and Value:

    • Measurement of Delivery Capacity: Throughput provides a direct view of the team's ability to convert planned work into delivered value. An increase in throughput indicates that the team is being more effective in bringing work items to completion.

    • Identification of Bottlenecks: Tracking throughput along the value stream can help identify bottlenecks or areas where work accumulates and delays delivery. This may signal the need to optimize certain processes or improve collaboration between different roles or teams.

    • Evaluation of Flow Stability: Consistent throughput over time suggests a stable and predictable workflow. Significant variations may indicate instability or the presence of factors disrupting the workflow.

    • Planning Validation: Comparing actual throughput with the amount of planned work helps validate the accuracy of planning and the team's ability to meet its commitments.

  • Important Considerations:

    • Clear Definition of "Delivered": It is essential to have a clear and shared definition of what "delivered" means for the team. This could mean deployed in a production environment, validated by the user, or meeting certain acceptance criteria.

    • Focus on Delivered Value: Throughput should focus on the delivery of real value to the customer or the business, not just the completion of individual tasks.

    • Complementary to Velocity: While velocity measures the amount of work completed within an iteration, throughput focuses on the amount of work delivered at the end of the value stream over a period. Both metrics provide valuable but different perspectives.

3. Change failure rate:

  • Definition: The change failure rate measures the percentage of changes (code deployments, configurations, etc.) that require correction or generate incidents after being implemented in a production environment or a significant test environment.

  • Purpose and Value:

    • Indicator of Work Quality: A high change failure rate can signal quality problems in the code, testing, deployment process, or understanding of requirements. Monitoring this metric helps the team identify areas where the quality of work needs to be improved.

    • Impact on System Stability: A high failure rate can lead to system instability, service interruptions, and the need to dedicate time and resources to correcting errors, which in turn affects the team's ability to deliver new value.

    • Feedback for Improvement: The analysis of change failures provides valuable information for team retrospectives, allowing for the identification of the root causes of problems and taking actions to prevent them in the future (e.g., improving unit tests, continuous integration, code reviews).

    • Measurement of the Effectiveness of Engineering Practices: A low change failure rate may indicate the effectiveness of the agile engineering practices adopted by the team, such as test-driven development (TDD), continuous integration, and continuous delivery (CI/CD).

  • Important Considerations:

    • Clear Definition of "Failure": It is important to clearly define what constitutes a "change failure" for the metric to be consistent and meaningful.

    • Context of the Change: Not all changes are equal in terms of complexity and risk. It is useful to consider the context of the failures to better understand their impact.

    • Focus on Prevention: The main objective of this metric is not to blame, but to provide information for improving processes and preventing future failures.

4. Flow efficiency:

  • Definition: Flow efficiency is a metric that assesses what proportion of the total time a work item spends in the system (from start to completion) is actually spent on active work, as opposed to wait or blocked time. It is calculated as:

    Flow Efficiency = (Active Work Time / Total Time in System) * 100%

  • Purpose and Value:

    • Identification of Bottlenecks and Waste: Low flow efficiency indicates that a large part of the work item's time is spent waiting in queues, blocked by dependencies, or suffering delays. Identifying these points of inefficiency is crucial for optimizing the value stream.

    • Improvement of Cycle Time: By reducing wait time and blockages, cycle time, which is the total time it takes for a work item to pass through the system, can be significantly improved. An improvement in cycle time translates into faster value delivery.

    • Visualization of Workflow: Analyzing flow efficiency often requires visualizing the workflow (e.g., through a Kanban board) to identify the stages where the greatest delays occur.

    • Fostering Collaboration: Blockages and dependencies often highlight the need for better communication and collaboration among team members or with other teams.

  • Important Considerations:

    • Accurate Time Measurement: To calculate flow efficiency accurately, it is necessary to track the time work items spend in different states of the flow.

    • Focus on the System, Not Individuals: Flow efficiency is a metric at the system or team workflow level, not a measure of the individual efficiency of team members.

    • Flow Context: Flow efficiency can vary significantly depending on the type of work and the complexity of the system.

5. Team Engagement:

  • Definition: Team engagement is a qualitative metric that assesses the level of motivation, participation, satisfaction, and connection of team members with their work, their colleagues, and the goals of the team and the organization.

shelby-murphy-figueroa-tYq6MoiTR-E-unsplash1.webp

  • Purpose and Value:

    • Indicator of Team Health: A high level of team engagement is usually associated with better morale, greater collaboration, lower staff turnover, and a more positive work environment.

    • Impact on Performance: Engaged teams tend to be more productive, creative, and proactive in problem-solving. Low engagement can be a symptom of underlying problems affecting team performance.

    • Feedback for Leadership: Monitoring team engagement provides valuable feedback for the Scrum Master, the Product Owner, and other leaders, helping them identify factors that may be affecting morale and take measures to improve the work environment.

    • Culture of Continuous Improvement: An engaged team is more likely to participate actively in retrospectives, propose improvement ideas, and take responsibility for their implementation.

  • Important Considerations:

    • Qualitative Nature: Team engagement is inherently more qualitative than the previous quantitative metrics. Its measurement is often based on anonymous surveys, observations, informal conversations, and the analysis of team behavior (e.g., level of participation in meetings, initiative to solve problems).

    • Importance of Confidentiality: To obtain honest and useful information, it is crucial to ensure the confidentiality of surveys and other feedback mechanisms.

    • Tracking Over Time: Measuring team engagement regularly and observing trends over time is more valuable than a one-time measurement.

Conclusion

collaboration.webp

These five key metrics proposed by SAFe at the team level provide a holistic view of the Scrum team's performance and health. By tracking and analyzing these metrics regularly, teams can gain valuable insights for continuous improvement, optimization of the value stream, delivery of higher quality products, and fostering a positive and collaborative work environment.

It is essential to remember that these metrics should be used as tools for improvement and learning, not as mechanisms for control or individual performance evaluation. Context and careful interpretation of the data are essential for drawing meaningful conclusions and making informed decisions.

Andreina Garcia Zapata, Agile Coach

Andreina Garcia Zapata

Agile Coach


Our latest news

Interested in learning more about how we are constantly adapting to the new digital frontier?

Visualizing Software Quality with JIRA, Google Sheets, and Looker
Visualizing Software Quality with JIRA, Google Sheets, and Looker

Tech Insight

March 19, 2025

Visualizing Software Quality with JIRA, Google Sheets, and Looker

Scrum roles and responsibilities: a step towards transparency and engagement
Scrum roles and responsibilities: a step towards transparency and engagement

Insight

January 23, 2025

Scrum roles and responsibilities: a step towards transparency and engagement

Agility, Complexity and Empirical Method
Agility, Complexity and Empirical Method

Insight

December 18, 2024

Agility, Complexity and Empirical Method

Jeronimo Palacios, new advisor in Operating Models
Jeronimo Palacios, new advisor in Operating Models

Corporate news

October 1, 2024

Jeronimo Palacios, new advisor in Operating Models